Museum of The Metropolitan Cathedral of Athens 

PROJECT REVIEW

 

The work of the Cathedral Museum of the Metropolitan Temple of Athens has been completed and delivered. by M+Y Glass Solutions, a subsidiary of the Yalodomi Group, within the timetable and its technical specifications.

The Religious Guardianship of the Sacred Metropolitan of Athens, with its priceless objects, consists a flagship Spiritual Museum. The museum's exhibits are important sacred vessels, valuable books and manuscripts, even thrones where the kings sat when they were praying.

The inauguration of the Royal Guardianship of the Metropolitan Temple of Athens was celebrated by the Archbishop of Athens and all Greece, Hieronymus, in the presence of the President of the Republic, Prokopis Pavlopoulos. At the inauguration ceremony were present all the high priests, the Minister of Education,Niki Kerameos, as well as the government's spokesman, the ministers, the deputies, the Attica regional's governor George Patoulis and the mayor of Athens Kostis Bektianis They were all directedd to the basement of the temple, where they were guided to the heirloom.

Budget: 350.000,00 €
Period: 5/2018 – 7/2018

 

  • Mitr1
  • Mitr2
  • Mitr3
  • Mitr4
  • Mitr5
  • Mitr6
  • Mitr7
  • Mitr8

     

     

    Archaeological Museum of Corfu

     

    PROJECT REVIEW

    The project of subsidiary company M+Y Glass Solution of the Yalodomi Group was completed and delivered to the renovated and modernized Archaeological Museum of Corfu. 

    Budget: 800.000,00€

    Period: 2/2015 - 11/2015

     

     

     

     corfu2   corfu1

     

    NEW YORK HISTORICAL SOCIETY NEW YORK - USA

     

    The museum and collection

    The museum and collectionThe 4th floor of the New York Historical Society – theHenry Luce III Center for the Study of American Culture- recently underwent major renovation to reopen in May2017. The refurbished space, designed by renowned Czecharchitect, Eva Jiřičná, has been completely transformed:the re-imagined permanent collection is spread across fourgalleries, which are dedicated to women’s history, Tiffanylamps, silverwork and landmark objects respectively.

    The assignment

    To help the NYHS achieve this ambitious redevelopment,Meyvaert produced approximately 73 display cases: 21cases for the North Gallery, 9 cases for the Corridor Galleryand 43 for the Tiffany Gallery. Many of the showcasesfeature complex low-reflective curved glass, such as therecessed wall cases and the cylindrical freestanding cases.Two incredibly large showcases were also produced:measuring 30m in length and 6m in height. A plethora ofopening systems were used: multi-pivot doors and tilt andslide opening mechanisms. Some of the display casesincorporate drawers and fiber optic lighting.

    tableThe project: challenges & result

    The historical nature of the building in Manhattan meantthere were no proper unloading facilities, no storage spaceon site and only one old historical lift we could use totransport all the materials to the 4th floor. Furthermore, ourinstallation team faced suboptimal site conditions as themain contractor was still busy working in the building atthe time of installation. Nevertheless, Meyvaert succeededin completing the project successfully, despite thesechallenging site conditions and the tight project completiondeadline (12 months from start to finish).”- Gerhard Schlanzky - Director of Exhibitions, New-YorkHistorical Society

     